CNZTL TAILE | AHU EQUIPMENT SELECTION INPUT CHECKLIST Revision: 2026-11-01 Contact: Kalyn | kalyn6661@gmail.com COMPANY & PROJECT Company legal name: Contact name / email / telephone: Project name, country and full address: Application: Project HVAC designer / consultant: Equipment quantity: Required delivery date: AIR & THERMAL DUTY Airflow (m3/h): Fresh-air / return-air quantities: External static pressure (Pa), including pressure-drop basis: Cooling capacity / sensible and latent duty (kW): Heating capacity (kW): Entering air dry-bulb / wet-bulb or relative humidity: Required leaving air conditions: Chilled-water supply / return temperatures: Water pressure-drop allowance: Filter stages / classification: Humidification duty and method, where required: EQUIPMENT INTERFACES Indoor / outdoor installation: Available equipment dimensions and delivery access: Air inlet / outlet positions: Water connection and service access side: Power supply (V / phase / Hz): Control sequence / BMS interface: Control panel required / excluded: Materials / corrosion requirements: Other specification requirements: DELIVERY & COMMERCIAL SCOPE Requested currency: EXW / FOB / CIF / other agreed term: Named collection point / port / destination: Packing requirements: Required documents: Site installation and commissioning responsibility: ATTACHMENTS AHU schedule: Equipment layout and interface drawings: Project equipment specification: This checklist supports equipment selection and quotation. It is not a project cooling-load calculation or system design. Equipment manufacturing and supply is the base scope. Site works, installation, attendance and any additional service must be separately defined and agreed. Final performance, configuration, dimensions, packing, price and lead time require technical and commercial confirmation.