Chilled-water cabinet units that carry cooling, heating, filtration and humidity sections in one casing — configured to the duty point, the plant room and the air path of your project rather than to a catalogue block.
These are the situations our engineering team sees most often. If yours looks different, describe it — the casing configuration is the part that changes.
Custom does not mean unlimited. These are the variables our engineers work with when a standard casing does not fit the project.
You do not need any of this to start a conversation. It is the list we work through once drawings or a schedule arrive — sending it early shortens the loop.
| Air side | Supply air volume, external static pressure, allowable face velocity, duct connection sizes |
|---|---|
| Duty point | Entering and leaving air conditions, chilled-water supply and return temperatures |
| Space | Plant room dimensions, access route, lifting constraints, available maintenance clearance |
| Air quality | Required filtration stages, cleanliness target, any humidity or dew-point limit |
| Site conditions | Design ambient, altitude, power supply, noise limit at the nearest receptor |
| Project documents | Drawings, equipment schedule, specification section, BOQ — any format |
Air-side equipment is assembled in Huizhou, inspected before packing, and shipped as a complete package with the documentation the project needs.
Technical documents we can provide on request: unit drawings, selection data, fan and coil data, packing list and the certification documents that apply to the supplied scope.
Send them in any format. Our engineering team reviews the duty point and comes back with a technical selection and a custom proposal — manually, by a person who has read your documents.